Go top
Project information

Analysis and Study on the Flexible Operation of Spanish Nuclear Power in HEPLASE Executions

A. Bello L. Montero D. Sonowal K. Trindade Ribeiro

July 2025 - December 2025

Funding entity Endesa S.A


The aim of this project is to improve the quality of future forecasts by developing a study that realistically represents the flexible operation of Spanish nuclear power plants in HEPLASE model runs, always seeking an appropriate balance between accuracy and computational load.


2025_HEPLASE-T2